How We Work

One method and one set of service standards in every assignment, from a pre shipment survey to a total loss.

A preventive survey, step by step

1

Request

You tell us the cargo, the place and the date. We confirm the scope with you the same working day.

2

Survey plan

We agree what will be checked, who will attend and which documents we need from you.

3

On site

The surveyor attends the operation and records condition, quantities and handling with GPS tagged photographs, counts and measurements.

4

Report

Findings, photographs and remarks, available to download in TITAN Command.

5

If damage is found

The parties are notified at once, and the survey becomes the evidence for any claim that follows.

Service standards

Acknowledgement

Immediate

Overnight instructions by the start of the next working day; urgent ones at any hour.

Contact

Same day

With the parties, for instructions received in working hours.

Attendance

24 to 48 h

In cities with a Grupo PCA office; elsewhere according to distance.

Preliminary report

48 h

Maximum after the survey, as company policy.

Attendance dates also depend on the availability of the consignee and of the cargo.

Bulk urea in the hold during discharge

Evidence in the field

Sampling and chloride testing.

Samples of wet cargo, packaging or residual moisture are photographed in place, sealed and labelled with case reference, date, place and sampling point. The surveyor runs a silver nitrate test on site: a positive result shows chlorides consistent with sea water; a negative one points to fresh water from rain or condensation. Laboratory analysis is arranged when required.

Field equipment.

Camera and smartphone with GPS tagged photographs, infrared thermometer, tape measure and laser distance meter, silver nitrate test kit, sample bags, jars, seals and labels, and personal protective equipment.

When there is a claim

01

Instruction and attendance

Prompt contact with the parties and attendance as soon as the cargo is available.

02

Notice to carriers

Notice of loss and joint survey invitations, to protect recovery rights.

03

Inspection and evidence

Photographs, counts, weights and samples, with a field chloride test and laboratory support.

04

Cause

Transit records and physical evidence, stating clearly what could and could not be verified.

05

Mitigation and quantification

Segregation by damage category, so that only goods actually damaged are claimed.

06

Salvage

Offers from our buyer network; every retrieval supervised and weighed.

07

Reporting

Preliminary report with a reserve indication, then a final report with a detailed loss exercise.

08

Recovery support

Documents and figures for the recovery agents.

Independence and quality

Independence.

PCA Surveyors acts independently of carriers, consignees, forwarders, customs brokers and any other party with an interest in the outcome. A signed declaration of independence and conflict of interest is available on request.

Quality.

Grupo PCA holds ISO 9001:2015 certification (certification cycle 2026 to 2029), with a scope that includes cargo transport claims. Our senior surveyors hold the Lloyd's Agency qualifications in Technical Cargo Surveying and in Claims and Recoveries (Module 3, awarded in London in October 2025).

Cases

Actual PCA Surveyors cases. Party names, vessels and references withheld; values rounded.

Grab discharging bulk urea from a vessel hold

Bulk · Manzanillo · 2023

Bulk urea: certainty at discharge

The receiver of a bulk urea shipment reported possible caking before discharge. We were on board two days after notice and documented the condition of the cargo, hold by hold, while the vessel discharged. At the end of discharge the cargo was confirmed in good condition, with no extra labour, machinery or delay costs, and the claim notice was withdrawn.

2 days from notice to attendanceOn board during dischargeNo loss, no dispute

Bulk · China to Mexico · 2023

Diammonium phosphate (DAP), wetting in one hold

Part of a 4,400 MT shipment of DAP fertilizer was received wet and caked in one hold. We surveyed on board with the receiver's surveyor. The damage covered the entire top surface and the four sides of the cargo, while the hatch cover was in good condition: the pattern pointed to the hold being opened in rain at anchorage, not to a hatch defect. The first estimate of 1,000 MT affected was reduced to 127.8 MT after a detailed review, and a salvage offer was obtained for the damaged product.

1,000 to 127.8 MT, estimated vs. confirmed87% reductionUSD 67,900 lossUSD 4,200 salvage offer

Containerized · Vietnam to Mexico · 2025

Stainless steel pipes, rust damage

53 bundles arrived wet and corroded after two transshipments. We attended the day after instructions and notified the ocean carrier the same day. A positive silver nitrate test and the corrosion pattern pointed to prolonged chloride exposure, linked to a flooding incident reported on the first vessel. Total loss; salvage sold and weighed.

1 day from instruction to surveyPositive chloride testUSD 18,300 salvage recoveredUSD 50,900 net claim

Break bulk · China to Mexico · 2023

PET resin in jumbo bags, packaging damage

The consignee set aside 814 MT of food grade resin, a reserve of approximately USD 1.0 million. We had the cargo segregated by damage category and validated the count; shortages in closed bags were traced to filling at origin, and bags with packaging damage only were returned under the duty to mitigate. Three salvage offers obtained; retrieval supervised truck by truck.

814 to 50.6 MT, claimed vs. loss3 salvage offers35% of loss recoveredUSD 40,700 net loss

Rail · USA to Mexico · 2023

Yellow corn, rail derailment

18 hopper cars carrying 1,824.65 MT of yellow corn derailed in central Mexico. We attended the site the day after instructions. The spilled corn was contaminated and rejected as food grade product; we supervised the salvage retrieval at the site, 24 truckloads, each with a weighbridge ticket.

1 day from instruction to survey1,173.7 MT salvage retrievedUSD 58,500 salvage recoveredUSD 429,300 net loss

Break bulk · Vietnam to Mexico · 2025

Galvanized steel coils, impact damage

7 of 27 coils were confirmed with dents and surface oxidation. The first salvage bids were MXN 7.50/kg and MXN 8.00/kg; through sustained negotiation we placed the coils at MXN 13.00/kg, so the claim was settled as a 20.5% depreciation instead of a total loss.

+73% salvage price achieved79.5% of loss mitigatedUSD 34,300 salvage recoveredUSD 9,700 net claim

See the method on your next shipment